翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Abdullah Al-Mubarak Air Base : ウィキペディア英語版
Kuwait International Airport

Kuwait International Airport ((アラビア語:مطار الكويت الدولي), ) is located in Farwaniyah, Kuwait, south of Kuwait City, spread over an area of . It serves as hub for Jazeera Airways and Kuwait Airways. A portion of the airport complex is designated as Al Mubarak Air Base, which contains the headquarters of the Kuwait Air Force, as well as the Kuwait Air Force Museum.
==Overview==
The airport was first launched in the period of 1927-1928.〔(【引用サイトリンク】url=http://www.kuwait-airport.com.kw/DGCA/History_E.htm )〕 It was originally envisioned as a stop for British planes on their way to Imperial India. The main airport structure was executed and completed by Al Hani Construction joint venture with Ballast Nedam, The Netherlands.
The airport underwent a massive renovation and expansion project from 1999–2001, in which the former parking lot was cleared and a terminal expansion was built. This incorporated new check-in areas, a new entrance to the airport, the construction of a multi-story parking structure, and an airport mall.
Kuwait International Airport can currently handle more than nine million passengers a year. A new general aviation terminal was completed in 2008 under a BOT scheme and is operated by Royal Aviation. By the end of 2008, however, this terminal was modified to handle the scheduled services of now-defunct Wataniya Airways along with general aviation traffic. The terminal was renamed as Sheikh Saad Terminal.
On 3 October 2011, the Directorate General of Civil Aviation announced that a new Foster + Partners-designed terminal will begin construction in 2012 and will increase the annual passenger handling amount to 13 million passengers in its first phase with the option of expanding to 25 million passengers. The airport has finalized formalities for the construction of the terminal, which is due to begin construction in 2012 with completion by 2016. It would be built to the south of the current terminal complex with new access routes from the Seventh Ring Road to the south of the airport compound. It is designed as a three-pointed star, with each point extending 600 meters from the star's center. Two airside hotels will form part of the new building.
On 20 May 2013, The Director of Operations Management in the General Administration of Civil Aviation Essam Al-Zamil, announced that some of the flights will be diverted to Sheikh Saad Terminal instead of Kuwait Airport's main terminal, starting in July. He said that due to the large number of passengers and the growing number of aircraft, Kuwait Airport is over capacity. "This will be temporary until the new Terminal finishes in 2016" said Al-Zamil.〔(【引用サイトリンク】work=iNews Arabia )

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Kuwait International Airport」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.